Utility power was lost at approximately 11:00AM CDT at our 800 Jorie (CH1) facility. We automatically transferred to generator power at that point and the situation is stable at this time. ComEd is currently estimating that utility power will be restored by 12:30PM CDT. UPDATE: Utility power was restored at 12:15PM CDT. Facility was restoredRead more